Subscriber login

Local News
What you need to know for 04/27/2017

State shifts planned replacement for Fonda bridge

State shifts planned replacement for Fonda bridge

Despite starting design work to build to the west, the state Department of Transportation will inste

Despite starting design work to build to the west, the state Department of Transportation will instead build the new Route 30A bridge to the eastern side of the structure that spans the CSX railroad at Route 5 in the village.

Residents and officials were dismayed when they learned in April that DOT officials were planning to buy land and build to the west of the bridge built in 1949. DOT Region 2 design engineer Stephen Zywiak said today the change in plans, prompted by those concerns, will delay by a year the project, originally planned to start in 2010.

Zywiak said the new, three-lane bridge will provide a left-turn lane for motorists to travel west on Route 5, or Main Street.

DOT officials have said the bridge carries about 11,300 vehicles daily with 13 percent of that being large truck traffic. The DOT has to perform inspections more often on the bridge due to its deteriorating condition.

View Comments
Hide Comments
You have 0 articles 1 articles 2 articles 3 articles 4 articles 5 articles 6 articles 7 articles remaining of Daily Gazette free premium content.

You have reached your monthly premium content limit.

Continue to enjoy Daily Gazette premium content by becoming a subscriber.
Already a subscriber? Log In